Bar workflow

Bar equipment arranged by where a barista stands: seven zones, the drink paths that cross them, and the zone pairs a layout has to get right.

Sixty-six pieces of equipment, arranged by where a person is standing when they use them. The categories are how you buy a bar; this is how you stand in one.

The nine zones

Each cuts across the purchase categories on purpose. Seventeen smallwares live in two different places, and two of these zones are not places you stand in at all — they are conditions every station inherits.

Water services — supply and waste

Everything upstream of the first drink and downstream of the last one. Treatment conditions the water every hot machine will ever see; drainage carries away what the bar discards. (Used: monthly service)

Equipment here: Water supply test kit · Sediment and carbon filtration · Ion-exchange softener · Reverse osmosis unit · Remineralisation and blending · Scale-inhibition cartridge · Bar drainage and waste connection

Grind

Particle reduction immediately before extraction. The only station whose output degrades in seconds rather than hours. (Used: every drink)

Equipment here: Espresso grinder · Dedicated filter grinder

Extraction

Where pressure, temperature and time meet the coffee. The busiest square metre on most bars and the one that sets the ceiling on throughput. (Used: every drink)

Equipment here: Espresso machine · Portafilter · Precision filter baskets · Calibrated tamper · Distribution tool · WDT tool · Tamping mat and station · Knock box · Bar scale (0.1 g) · Graduated shot glasses · Blind basket & backflush detergent · Group head brushes

Milk

Texturing and temperature. The step with the shortest usable window — textured milk has to be poured while it is still one liquid. (Used: every drink)

Equipment here: Steaming pitcher · Milk texturing — manual wand to programmable system · Pitcher rinser · Milk thermometer · Underbar milk fridge · Latte art pens & etching tools

Brew and hot beverage

Everything hot that is not espresso. Long-running, mostly unattended, and therefore the zone that should be furthest from the crush. (Used: every drink)

Equipment here: Batch brewer · Hot water boiler & dispensing tower · Dedicated hot water tap · Çaydanlık — stacked concentrate teapot · Matcha whisk, bowl and sifter · Infusers & strainers · Brew timer

Cold build and assembly

Where a drink becomes the thing that is handed over: ice, syrup, dilution, the vessel it leaves in. (Used: every drink)

Equipment here: Underbar refrigeration · Sauce pump · Syrup pump · Jiggers and volume measures · Muddler · Barspoon · Strainers · Glassware by beverage · Takeaway cups, lids and carriers · Colour-coded boards · Ice machine · Ice storage bin · Bar-duty blender · Frozen beverage dispenser · Cold brew brewing and holding vessel · Spindle mixer · Ice scoops, holders and transfer totes

Wash and waste

Hand hygiene, ware washing and waste. A station in its own right, not a corner of another one — the food-safety separation is the whole point of it existing separately. (Used: every shift)

Equipment here: Dedicated hand-wash sink · Ware-wash sink · Waste separation and bin housing

Order and pass

Where the order enters and the drink leaves. The only zone the customer is also standing in, which changes what it can be optimised for. (Used: every drink)

Equipment here: Order terminal (POS) · Receipt and ticket printer · Cash drawer · Kitchen display system (KDS) · Label printer · Tablet mounts

Bar fabric and building services

The substrate every other zone sits in: the worktop, the carcass under it, the floor, the light, the power and the air. Not a place a barista travels to — a set of conditions every station inherits. (Used: every shift)

Equipment here: Bar counter and worktop substrate · Under-counter carcass and modular bar cabinetry · Extraction and ventilation · Flooring and anti-fatigue matting · Lighting at the working plane · Power distribution and containment

What the drinks actually cross

Five representative orders, as the sequence of zones each one travels. The contention figures below are counted from these paths, not asserted — if a path changes, the numbers move with it.

The pairs a layout has to get right

Equipment, workflow & commissioning